Electricraft, Inc. has accomplished or is currently working on the following projects:
Nacimiento Dam Spillway

Notable Current Projects :

Power, controls, 100KW emergency generator and CCTW systems for new spillway gates system.
Nacimiento Pipeline Central

Notable Current Projects :

80,000 feet of Fiber Optic Cable installation and new electrical power service to turn out locations along pipe route



Residential Solar Installation

2009 :

Complete installation of a 3 kilowatt post mounted solar system for a private residence. Solar Panels Installed by Electricraft, Inc.Back Side of Solar Panel               



Sustainability Conference, Cal Poly State University

2008 :

Remove and replace numerous existing light fixtures with energy efficient fixtures to showcase advances in environmentally friendly lighting technology.Bi-level Motion Detected LED Walkway Light
                                                                                   

Old Fixture New Energy Efficient LED Ballard
Sierra Vista Parking Garage

2008 :

Lighting and Power for a new concrete multi story Parking Structure.
Los Osos Booster Pump Station

2008 :

New service, power, control, 250KW emergency generator for a multi-pump water Booster Pump Station Upgrade
Mountainbrook Community Church

2008 :

Installation of complete electrical, lighting and data for new facility
Diablo Canyon Independent Spent Fuel Storage

2008 :

Construction of the security system at the Independent Spent Fuel Storage Facility



Superior Court Facility

2007 :

Lighting Installed by Electricraft, Inc.Installation of complete electrical, data, security and specialty systems for a new California Superior Court Building.
Generator Replacement

2007 :

Removal retrofit and replacement of 2-150 KW generators at 2 Cayucos sewer lift stations.
Salinas Generator Installation

2007 :

Modified sites and electrical systems of 3 sewer lift stations to accommodate 3 new 60 KW emergency generators.



Beef Unit, Cal Poly State University

2006 :

Complete electrical installation of new beef handling and education facility.
Santa Maria Landfill

2006 :

Power and control for expansion of gas flare system
Marine Science Center, Cal Poly State University

2006 :

Complete electrical and generator installation for a new marine education facility.

San Luis Obispo Water Treatment Plant

2006 :

Provided power, control and instrumentation for the implementation of the Water Treatment Plant Improvement Project to enhance operational capabilities of the facility. Construction included two above-ground steel storage tanks, a new Transfer Pump Station with four 2mgd vertical turbine pumps, modifying two existing 8mgd flocculation basins to two Actiflo process trains, Chemical feed systems, HVAC and electrical, instrumentation and Emerson Process plant control upgrades through out the facility.
Lewis Avenue Bridge

2006 :

Installation of electrical and lighting system for new vehicle and pedestrian bridge.



Dolphin Bay, Shell Beach

2005 :

Power and lighting for new hotel and restaurant.
Bonderson Engineering, Cal Poly State University

2005 :

Complete electrical power, control, lighting and special system installation of a new engineering building
Water Treatment Plant

2005 :

Complete power and control for Arsenic removal system.
Cuyama Elementary School

2005 :

New electrical service, sub feeds and branch circuits to existing distribution system and panel boards.
Arroyo Grande Lift Station

2005 :

Remodel and expansion of existing alternating pump sewer lift station.
Street Lighting

2005 :

Construction of new underground distribution and control for new city architectural street lights and power to curb side receptacles for city use.



Cachuma Lake/Bradbury Dam

2004 :

Seismic retrofit involving a new long distant underground service crossing the dam face, gate proximity sensors and control, lake level sensors and automated control and generators.
El Chorro Maintenance Building

2004 :

Install electrical for new building and connection of septic pump, floats & control panel. 
Air Vol Block

2004 :

Power and controls for block tumbling, bagging, drying and 3 batching and mixing plants.