Electricraft, Inc. has accomplished or is currently working on the following projects:
Nacimiento Dam Spillway
Nacimiento Pipeline Central
Residential Solar Installation
Sustainability Conference, Cal Poly State University
Sierra Vista Parking Garage
Los Osos Booster Pump Station
2008 :
New service, power, control, 250KW emergency generator for a multi-pump water Booster Pump Station UpgradeMountainbrook Community Church
2008 :
Installation of complete electrical, lighting and data for new facilityDiablo Canyon Independent Spent Fuel Storage
2008 :
Construction of the security system at the Independent Spent Fuel Storage FacilitySuperior Court Facility
Generator Replacement
2007 :
Removal retrofit and replacement of 2-150 KW generators at 2 Cayucos sewer lift stations.Salinas Generator Installation
2007 :
Modified sites and electrical systems of 3 sewer lift stations to accommodate 3 new 60 KW emergency generators.Beef Unit, Cal Poly State University
2006 :
Complete electrical installation of new beef handling and education facility.Santa Maria Landfill
2006 :
Power and control for expansion of gas flare systemMarine Science Center, Cal Poly State University
2006 :
Complete electrical and generator installation for a new marine education facility.
San Luis Obispo Water Treatment Plant
2006 :
Provided power, control and instrumentation for the implementation of the Water Treatment Plant Improvement Project to enhance operational capabilities of the facility. Construction included two above-ground steel storage tanks, a new Transfer Pump Station with four 2mgd vertical turbine pumps, modifying two existing 8mgd flocculation basins to two Actiflo process trains, Chemical feed systems, HVAC and electrical, instrumentation and Emerson Process plant control upgrades through out the facility.Lewis Avenue Bridge
2006 :
Installation of electrical and lighting system for new vehicle and pedestrian bridge.Dolphin Bay, Shell Beach
2005 :
Power and lighting for new hotel and restaurant.Bonderson Engineering, Cal Poly State University
Water Treatment Plant
2005 :
Complete power and control for Arsenic removal system.Cuyama Elementary School
2005 :
New electrical service, sub feeds and branch circuits to existing distribution system and panel boards.Arroyo Grande Lift Station
2005 :
Remodel and expansion of existing alternating pump sewer lift station.Street Lighting
2005 :
Construction of new underground distribution and control for new city architectural street lights and power to curb side receptacles for city use.Cachuma Lake/Bradbury Dam
2004 :
Seismic retrofit involving a new long distant underground service crossing the dam face, gate proximity sensors and control, lake level sensors and automated control and generators.El Chorro Maintenance Building
2004 :
Install electrical for new building and connection of septic pump, floats & control panel.Air Vol Block
2004 :
Power and controls for block tumbling, bagging, drying and 3 batching and mixing plants.















.jpg)


Installation of complete electrical, data, security and specialty systems for a new California Superior Court Building.